Popular Posts

Showing posts with label navy. Show all posts
Showing posts with label navy. Show all posts

Friday, June 15, 2012

By the Numbers



From the May 2012 Rotor and Wing, h/t Andrew Drwiega...


Some numbers mentioned during Sen Jeff Sessions' speech before the Army Aviation Association of America.  


Over the last three years...


- Defense spending has increased 10%.
- Medicare spending has increased 37%.
- Department of Education spending has increased 70%.


Food stamp spending has increased 300% since 2001.  


The wars in Iraq and Afghanistan have cost $1.3 trillion over the last ten years.  


The US budget deficit for LAST year was $1.3 trillion.  


In 1962, defense was 48% of the budget, while entitlement spending was 26%.  In 2013, defense will be 19% of the budget and entitlement spending will be 60%.  


The Department of Defense (DoD) budget is $688.3 billion out of a total Defense budget of $903.3 billion ($130 billion for vets, $43.8 billion for foreign economic aid, and $12.5 billion for foreign military aid).  


With continuing budget deficits each year exceeding $1 trillion, completely eliminating the DoD outright would not balance the budget.  


Guns or butter, take your pick.  

Saturday, February 25, 2012

Deaf Whales, Dumb People



















I am a former military officer now working as a contractor in the oil and gas industry.  


Those of you in the marine mammal conspiracy business can stop reading now, as you have probably already fingered me as part of the conspiracy. That's right, I'm bought and paid for by the military and big oil, who somehow are able to get everybody at every whale stranding and every researcher to lie to the media, and protect the public from the shocking truth, all to kill whales for a tidy profit cause they JUST DON'T CARE. (evil laughter)


Let's start off with a few basic assumptions.  Let's say that naval sonar harms marine life, and seismic exploration does too. This is more theory than hard science, but let's say that it does anyway. Let's say that the merits of the environmentalist case vs. the training needs of the Navy have already been heard by the Supreme Court and it didn't go well for the environmentalists.  Let's say that the evil Navy and big oil all employ marine mammal observers whose function is to shut down the sonar and seismic surveying any time marine mammals are detected.  Because they do.  Finally, let's say that marine mammals who encounter offensive seismic and sonar activity go the other way and leave the area.  This is called a flight response, and it can be found throughout nature, though it never shows up in any stories about underwater noise.   


Now I'm not a marine biologist, or a whale specialist, I'm just a dumb guy who flies helicopters.  So riddle me this.  


I have been on a seismic boat, traveling in a miles-wide circle with many other boats, all performing seismic surveying.  These boats do maybe 5 knots wide open during the survey, in a circle, and the circle is slowly sliding across the water, air guns blazing all the while.  Meanwhile, as I am on the boat, a pilot whale and some dolphins swim right by the bridge, directly for the air guns, which results in the marine mammal observer shutting down the survey.  It is not as if the boats snuck up on the mammals or ran them down, even the pilot whale can make near 20 knots in a pinch.  My question is...


1. Are these whales STUPID?
2. Are these whales DEAF?
3. Has all this seismic activity rendered the whales sense of direction completely useless, as the conspiracy states?  
4. Or maybe, just maybe, does all this seismic activity NOT affect the whales and the dolphins as severely as the environmentalists state?


I really don't know.  But I know that environmentalists will soundly reject item #4, though their superior intellect and scientific backing still can't provide more than anecdotal arguments to support their theories, which all conclude that the military and the oil industry are REAL BAD.  


Environmentalists hate both the military and big oil, and would like to see them both shut down or severely restricted for their sins against mother earth.  


Now there's a shocking truth for you.  

Tuesday, October 11, 2011

Old procurement joke...













A good plan with funding is a DREAM.  


A good plan without funding is a HALLUCINATION.  


Funding without a good plan is a NIGHTMARE.  

Monday, August 15, 2011

On military procurement...



V-22 Osprey

Recently I have been listening to the audio book “The Dream Machine: The Untold History of the Notorious V-22 Osprey”.  It’s an exhaustive history of the V-22 tilt-rotor program over the decades, and it got me thinking about my own time working procurements in the Army. 

Procurement in the DoD is a nasty business.  To illustrate, let us use a theoretical example of a “joint” project, meant to save the DoD money by fielding one common system to all branches; Army, Navy, Air Force, and Marines. 

First, someone at the Pentagon briefs a long PowerPoint show on the money spent on cutlery in DoD dining facilities, and how things can be done better and cheaper if we can all just agree on a common solution which will take us through the next four decades.  Some four star agrees, funding is slipped into a bill in congress under the radar, and the Joint Spork Office is formed and staffed at some installation, somewhere. 

Theoretical "Joint Spork"

The services all go on a long TDY somewhere, to whatever location has better hotels, to have a week’s worth of day-long meetings to determine their requirements for the new spork.  The Marines are angry that they don’t get to go because the Navy gets to represent their interests at the meeting. 

The Army wants the spork to be capable of digging a fighting position, and the field artillerymen want to be able to quickly convert it for use as a flechette in case a dining facility is overrun. 

The Navy needs a marinized version in order to use the spork while underway at sea, and to shoot it out of torpedo tubes. 

The Air Force needs it to be able to survive an ejection at 60,000 feet, and be able to cut through an aircraft fuselage for airfield rescue. 

The Marines really need the spork to have a bayonet lug, so that they might attach it to their rifles when the battle is going very badly. 

After spending all week dining out but not agreeing on much of anything, the services retire to their respective installations, fire off lots of emails, and control of the project disappears deep into their separate bureaucracies, each with wildly different priorities and processes.  Months go by between meetings, years go by before the project gets any traction.  Somehow, soldiers, sailors, airmen, and marines make do with legacy edition cutlery, although some cut themselves and nearly starve due to the inherent inadequacies of the low-tech fork, knife, and spoon. 

Other DoD-level bureaucracies lobby to test the new spork, shooting it, electrifying it, blowing it up, or whatever they need to do to justify the existence of their individual testing organizations, which forces unforeseen design changes and cost overruns.  More years drag by.  The spork design becomes heavier and more costly, and hardly fit to eat with. 

By and by, the Air Force goes out on their own and procures their own spork, in defiance of DoD policy and federal law, but at least they are the first to field a spork, while the joint spork languishes in the two year long operational testing phase. 

Eight years later, the joint spork is ready for production, meeting 80% of the specified requirements, and costing in the neighborhood of $150 per unit.  Meanwhile, mil-spec copies can be found on eBay for $12.  While this is meant to be a humorous example, this is exactly how we get to the legendary $600 toilet seat of DoD procurement lore. 

There are other reasons for cost overruns besides “jointness”.  Let us examine a few of them. 

Particularly in the case of high-tech and leap-ahead technologies like the V-22 (read: technologies that have not been designed yet), it is impossible to know at the outset of the project how much per airplane you are going to pay.  Aircraft invariably gain weight and lose capabilities during development as the project transitions from fanciful requirements and marketing promises to what is actually achievable in reality with a fixed budget. 

By the time it is apparent that an aircraft will not meet both its target costs nor its performance goals, enough time and money has been invested (and the contract cancellation costs are so high) that it is not financially feasible to bail out of the project.  This brings to mind the DoD truism that there are two phases of any procurement project… too early to tell, and too late to stop. 

Another procurement truism simply states: good, fast, cheap… pick two. 

If you want high quality, you can have it fast, or cheap… but not both. 

If you want it fast, you can have quality, or low cost… but not both. 

And if you want it cheap, you can do it right, or it’ll take much longer. 

Not to say that any of this is correct, but it IS the way that the DoD does business! 

Lastly, the requirements, budgets, and “want lists” of the services constantly change with the political winds, competing priorities for limited defense dollars, etc. etc.  This is where you sometimes feel sorry for the contractors.  Originally told that they will be building 2000 aircraft for three branches of service, two services will drop the aircraft completely over the decades-long development cycle, the sole remaining service will change the amount that they want to buy six times, money will too tight to fund all of the original requirements, and other requirements will be worked around and dropped at the behest of the service in order to stay somewhat on budget. 

When the final bills come in and only 400 aircraft are ordered of the original 2000, every newspaper on the beltway will report how badly the project is over budget and what a piece of junk the aircraft is, and the specter of the “military industrial complex” will ride again, for a short time. 

As ugly as the process is, it is ultimately important that we suffer through this charade and fund leap-ahead technologies to maintain our military’s technological overmatch against potential enemies, because we always roll into battle with what’s on the shelf, and not what we really need.  An example from Iraq:

During the initial invasion, I know soldiers who spent seventeen months in Sadr City, working out of light HMMWV vehicles, with NO armor, and only fabric doors.  This is unforgivable in 2003, as the light armor of the HMMWV vehicles had proven to be inadequate for combat in Somalia in 1993 and even in Bosnia in the late 1990s against the land mine threat… with nobody shooting.

HMMWV without armor

By the time I arrived there for the first time in 2005 with a ground unit, IEDs were taking a heavy toll on American troops, and there was a major push to armor ALL Army ground vehicles, first with torch cut plate steel doors, and later with bolt-on armor kits.  Casualties continued to mount from IEDs, as bombs can be built faster than armored vehicles can be designed and fielded.

HMMWV with armor kit

Beginning in 2007, the MRAP family of mine-resistant vehicles began to replace armored HMMWVs, and after six years and thousands of US casualties, the US Armed Forces had a solution that was NEARLY adequate to meet the threat on the ground. 

MRAP

Why did the US not have MRAPs earlier?  They WERE in Iraq, at least since 2005.  Not with the US, but in the service of some foreign armies.  Since the first MRAP designs were of South African manufacture, and symbolic of the apartheid era in that region, most Western armies wanted nothing to do with them and would not purchase them from South Africa, regardless of operational necessity. 

And those kind of decisions, along with unbridled spending cuts, get troops KILLED.  

Buffalo MRAP in Iraq, circa 2005

Saturday, August 6, 2011

Taking care of the troops


ex·pert
[n., v. ek-spurt; adj. ek-spurt, ik-spurt]

noun

1. a person who has special skill or knowledge in some particular field; specialist; authority: a language expert.


First of all, a few basic assumptions to set the stage for this rant...

- To members of the military, WHERE YOU HAVE BEEN and WHAT YOU HAVE DONE while in the military is essential to establishing your credibility, and everything else is pretty much subordinate to this. It’s just the way they think.

- The Department of Defense is an intractable bureaucracy that wastes immense sums of taxpayer money on a daily basis without batting an eye. It is difficult to comprehend how high, wide, and deep is the fraud, waste, and abuse within the DoD. Moreover, the DoD hasn’t the slightest interest in addressing the problem or fixing it.

- The DoD is going to need to cut lots of money out of the budget very soon whether they like it or not.

- The military COULD stand to think outside the institutional box when making the aforementioned cuts.

- It MAY not send the right message to an all-volunteer force to propose deep cuts to their benefit packages in the midst of three wars.

With this in mind, it was with much distress that I read about the Defense Business Board’s plan to overhaul the military retirement system, essentially replacing the twenty year retirement with a tiered 401K type plan, and thereby saving the DoD untold sums of money… all by reneging on the cornerstone of the military benefit package, a proposed move that is sure to have a unbelievable impact on retention.

If you were to ask “have any of the knuckleheads on this board ever served in the military?” you might be on to something. The board roster reads like a who’s who list of noted academics and businesspeople without even a tangential connection to anything military, save for a handful of DoD civilians and a few who have, like the current Secretary of Defense, spent much longer in undergrad programs than in uniform.

In fact, among the 21 board members (bios are provided for 19) FIVE have served in the military. One is a retired USMC Major General, a nice start, but the remaining four have A COMBINED TOTAL OF 19 YEARS OF MILITARY EXPERIENCE, not all of it on active duty. TWO of the five have combat experience. None of them hold Chair or Vice-Chair positions. And these are the people charged with revamping the military retirement system, not one of them having a stake in the outcome.

So I ask you, would you appoint a commission of noted pastry chefs to determine how much doctors should be allowed to bill? How about a panel of rocket scientists to negotiate union benefits for plumbers?

Only if you had no earthly idea of what you were doing when you appointed the commission…